Happy 2020

Happy 2020
Alpine

love

Check out my Adventure Blog!

Wednesday, October 31, 2018

Stone on the outside fireplace

Dry wall in the garage
They fixed the pipe
Jeff is not happy with how high up the pipe is.
Never forget how much you are loved!
Zack took Addie to a Halloween work party.
Kodi.  The dog who watches over our house.  Lol!

Trenches everywhere!
Doing the driveway!
The pictures actually start here and go up.  But my internet sucks and I'm not going to mess with it!  Lol!

Tuesday, October 30, 2018

Dry wall

They did the T-1-11 under the roof of the garage outcrop.
Form boarding for the cement outside the garage and getting some siding on the front.
Drywalled the ceiling in the garage.
Upstairs guest room storage door.
The little room has a little closet!
Looking down the stairs.
Downstairs view.
Looking up the stairs.
The vent downstairs.
Looking up from down stairs.
Looking out the front door
The mud bench and hall area
The hall and pantry

Saturday, October 27, 2018

More siding, some drywall and some stone

They finally got the siding on part of the front of the house. Oct 22nd.
The view from the side of the garage looking at he house.
This is how Antonio covered up the hole under the window.  
The back porch has siding
The moon looking off of the front porch
Spray in foam insulation in the house!!!  We couldn't believe how quite and cozy it felt inside the house! Oct 23rd.
The fireplace
The space between the two windows is where the TV will go.
Our bedroom
R38 insulation in the ceilings.  This is the little storage room.
Putting the forms down for cement.  It rained like crazy. Oct 24th
The stone is being put on the fireplace!
And dry wall!  This is the "mud bench" area
The "little room"
The hallway
The back of the house
The full view of the back of the house.
 Oct 25th
The stone is done of the roof side!
Brining in the water line
Ta da!  Looks better without the scaffolding in the way.
The back porch has tongue and groove on the ceiling (ok, it's really called T1-11).
Dry wall!